A Scheduling Problem in Wire Industry: Industrial Scheduling Solution in Multi Level Hybrid Flowshop Environment Using Simulated Annealing - Noyan Zümbülcü - 書籍 - LAP LAMBERT Academic Publishing - 9783843386333 - 2011年5月13日
カバー画像とタイトルが一致しない場合、正しいのはタイトルです

A Scheduling Problem in Wire Industry: Industrial Scheduling Solution in Multi Level Hybrid Flowshop Environment Using Simulated Annealing

価格
¥ 7.224
税抜

遠隔倉庫からの取り寄せ

発送予定日 年10月26日 - 年11月5日
Noyan Zümbülcü の新しいリリースのお知らせを受け取る
iMusicのウィッシュリストに追加

まだ評価がありません

In this book, properties and scheduling constraints of copper-wire production and scheduling problem are analysed. This problem can be decomposed into three main sections. Based on these sections, properties of the problem and the objective function within a mathematical model are defined and scheduling heuristics to cover both the multi-wire and bunching stages are demonstrated. In multi-wire stage, after acquiring an initial solution with simulated annealing technique, a scheduling solution is obtained. This solution is considered as an input for the second stage and jobs in bunching stage are scheduled with another heuristic and final result is revealed out. Final result is compared with the planners results and efficiency of the proposed heuristic method is evaluated. Heuristic algorithms proposed in this book consider the relevant sector specific constraints like tardiness to the due date, sequence dependent setup times, machine eligibility constraints, parallel machines in bunching, spool weight and type. Tests about the heuristic are performed with the real production data of a wire production company. Possible further studies are also mentioned in the conclusion section.

メディア 書籍     Paperback Book   (ソフトカバーで背表紙を接着した本)
リリース済み 2011年5月13日
ISBN13 9783843386333
出版社 LAP LAMBERT Academic Publishing
ページ数 92
寸法 150 × 6 × 226 mm   ·   155 g
言語 ドイツ語