Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution - Khalid S. Al-gahtani - 書籍 - LAP LAMBERT Academic Publishing - 9783843350709 - 2010年12月13日
カバー画像とタイトルが一致しない場合、正しいのはタイトルです

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution

価格
¥ 11.283
税抜

遠隔倉庫からの取り寄せ

発送予定日 年10月23日 - 年11月4日
Khalid S. Al-gahtani の新しいリリースのお知らせを受け取る
iMusicのウィッシュリストに追加

まだ評価がありません

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

メディア 書籍     Paperback Book   (ソフトカバーで背表紙を接着した本)
リリース済み 2010年12月13日
ISBN13 9783843350709
出版社 LAP LAMBERT Academic Publishing
ページ数 324
寸法 226 × 18 × 150 mm   ·   476 g
言語 英語