Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report - U.s. Nuclear Regulatory Commission - 書籍 - CreateSpace Independent Publishing Platf - 9781500611279 - 2014年7月22日
カバー画像とタイトルが一致しない場合、正しいのはタイトルです

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report

価格
¥ 3.908
税抜

遠隔倉庫からの取り寄せ

発送予定日 年12月10日 - 年12月23日
クリスマスプレゼントは1月31日まで返品可能です
iMusicのウィッシュリストに追加

The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a ?Framework? that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.

メディア 書籍     Paperback Book   (ソフトカバーで背表紙を接着した本)
リリース済み 2014年7月22日
ISBN13 9781500611279
出版社 CreateSpace Independent Publishing Platf
ページ数 182
寸法 216 × 279 × 10 mm   ·   435 g
言語 英語  

すべて表示

U.s. Nuclear Regulatory Commissionの他の作品を見る